1948 MLK Mixed Use

Milwaukee, WI
New Construction
Medical Office Building Overcomes City Design Restrictions

At A Glance

  • SUMMARY: New construction of medical office building for podiatry and physical therapy with apartments above
  • SIZE: 12,00 sf
  • COMPLETION: 2019
  • CONSTRUCTION COST: $2 million
  • OWNER: Scott Crawford, Dr. Deacon
Get in touch

Project Overview

This new construction is located on a portion of North Dr. Martin Luther King Jr. Drive considered a historic and thus had to be constructed within strict guidelines. Despite the Historic King Drive New Construction Standards, Continuum was able to create a modern, dynamic building, without having to create false history, as the Standards encourage.  The building has space for 3 medical professionals with 6 treatment rooms and a private surgical suite.  In addition, space was also designed for a bright, open physical therapy wing, as well as future expansion space on the second level. Above, are four two-bedroom apartments with private balconies which offer unique views from the tallest building on the block.

Get in touch